ARC Power Systems
sales@arcpowersystems.com
(213) 371-2848
Menu
  • HOME
  • INVENTORY
    Generators
    251-499 GeneratorsAggregate & Quarry GeneratorsCARBCARB-Compliant GeneratorsConstructionConstruction GeneratorsData CenterData Center GeneratorsDrilling Rig PowerHospitalHospital Backup GeneratorsManufacturingManufacturing GeneratorsNatural Gas GeneratorsOil & GasOil & Gas GeneratorsPower Plant EquipmentPrime Power GeneratorsRENTAL GRADE PORTABLESRental Grade Towable GeneratorStandby GeneratorsStationaryStationary GeneratorsTier 4 Final CertifiedTier 4 Final GeneratorsTowable GeneratorUsed Multiquip GeneratorsUtility & Data Center PowerOther Generators
    Transformers
    Power Transformers

    View All
  • NEWS
  • SELL US YOUR GENERATOR
  • ABOUT US
  • CONTACT US

NEWS

Caterpillar vs. Cummins Generators: Which One Is Better for Industrial Power?
Published:2026-05-23
Caterpillar vs. Cummins Generators: Which One Is Better for Industrial Power?

When buyers call ARC Power Systems looking for an industrial generator, two names come up more than almost any others: CAT and Cummins.

The question usually sounds simple:

“Wh...

Read more
Lake Tahoe’s Power Supply Problem Is a Warning Shot for Every Business That Depends on the Grid
Published:2026-05-22
Lake Tahoe’s Power Supply Problem Is a Warning Shot for Every Business That Depends on the Grid

Lake Tahoe is now dealing with a power supply issue that should get the attention of every business owner, facility manager, municipality, contractor, data center developer, and...

Read more
Should You Buy or Rent an Industrial Generator? A Practical Guide for Businesses
Published:2026-05-22
Should You Buy or Rent an Industrial Generator? A Practical Guide for Businesses

It is one of the most common questions we hear from customers:

“Should I buy an industrial generator, or should I rent one?”

The answer depends on what you are trying to prote...

Read more
2022 Cummins 1000DQFAH 1000kW Tier 4 Final Diesel Generators Available Now
Published:2026-05-18
2022 Cummins 1000DQFAH 1000kW Tier 4 Final Diesel Generators Available Now

Late-Model 1MW Cummins Power Without the New-Build Wait

When a project needs serious power, timing matters.

A data center cannot wait six months for backup power. A manufactur...

Read more
When the Grid Can’t Keep Up: How 26MW of CAT G3520 Natural Gas Power Can Keep Critical Projects Alive
Published:2026-05-16
When the Grid Can’t Keep Up: How 26MW of CAT G3520 Natural Gas Power Can Keep Critical Projects Alive

A Realistic Scenario: The Data Center That Cannot Miss Its Launch Window

Now take a data center developer.

The building shell is moving. The cooling equipment is planned. The ...

Read more
Standby vs Prime vs Continuous Generators: What Commercial Buyers Need to Know
Published:2026-05-13
Standby vs Prime vs Continuous Generators: What Commercial Buyers Need to Know

When people shop for a commercial generator, they usually start with the obvious questions.

- How many kilowatts do I need?
- Is it diesel or natural gas?
- Is it 480V 3-phas...

Read more
  • «
  • ‹
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • ›
  • »
ARC Power Systems
  • INVENTORY
  • NEWS
  • SELL US YOUR GENERATOR
  • Use Our PowerMatch Tool
  • ABOUT US
  • CONTACT US
  • Privacy Policy